Customization: | Available |
---|---|
Type: | Pipe Extruder |
Plastic Processed: | PVC |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model/data | Pipe diameter | Extruder model | Speed | Max capacity |
FP63 | 16-63mm | LSZ51/105 | 1-10m/min | 120kg/h |
FP160 | 75-200mm | LSZ65/132 | 1.5-5m/min | 260kg/h |
FP400 | 200-400mm | LSZ80/156 | 0.5-1.5m/min | 400kg/h |
FP630 | 400-630mm | LSZ92/188 | 0.1-0.8m/min | 650kg/h |
Compulsory devices | ||||
1 | Material charge | 1 set | ||
2 | Conical twin screw extruder SJ-65/132, 80/156, 92/188 | 1 set | ||
3 | Pipe die head | 16-800mm, 1 set or several sets | ||
4 | Vacuum calibrating tank | 1 set or several sets | ||
5 | Water spraying cooling tank | 1 set or several sets | ||
6 | 2-3-4-6-8-10-12 caterpillars hauling off machine | 1 set | ||
7 | Saw cutting machine or planetary cutting machine | 1 set | ||
8 | Pipe stacker-6000mm length | 1 set | ||
9 | Electrical cabinet(ABB, Omron, RKC, Schneider etc) | 1 set | ||
10 | Spare parts | 1 set | ||
Optional Devices | ||||
1 | High speed hot and cold mixer | 1 set | ||
2 | Plastic crusher | 1 set | ||
3 | Plastic pulverizer | 1 set | ||
4 | Industrial water chiller | 1 set | ||
5 | Air compressor | 1 set | ||
6 | Thermocontroller for die head | 1 set | ||
7 | Ink jet printer | 1 set | ||
Payment, delivery and after sales services | ||||
1 | Payment terms | 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable | ||
2 | Delivery time | 60 days after receipt of prepayment | ||
3 | Packing method | Wooden cases/pallets with stretching films | ||
4 | Guaranteed time | 18 months for mechanical parts, 12 months for electrical parts | ||
5 | After sale service | Send 1-2 engineers to customers' factory to help them install, test the machine, and train their workers. This is chargeable | ||
6 | Contact information |