Customization: | Available |
---|---|
Type: | Extrusion Blow Molding Machine |
Automatic Grade: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
7200bph Semi Automatic Bottle Blowing Machine
Model | FG4 | FG6 | FG8 | Remark | |||
Mold number(piece) | 4 | 6 | 8 | ||||
Capacity(BPH) | 6500~8000 | 9000~10000 | 12000~13000 | ||||
Bottle specification | Max volume(mL) |
2000 |
2000 |
750 |
|||
Max height(mm) |
328 |
328 |
328 |
||||
Round bottle max diameter(mm) |
105 |
105 |
105 |
||||
Square bottle max diagonal(mm) |
115 |
115 |
115 |
||||
Preform specification | Suitable inner bottle neck(mm) |
20--25 |
20--25 |
20--25 |
|||
Max preform length(mm) |
150 |
150 |
150 |
||||
Electricity | Total installation power(kW) |
51 |
51 |
97 |
|||
Heating oven real power(kW) |
25 |
30 |
45 |
||||
Voltage/frequency(V/Hz) |
380(50Hz) |
380(50Hz) |
380(50Hz) |
||||
Compressed air |
Pressure(bar) |
30 |
30 |
30 |
|||
Cooling water | Mold water | Pressure(bar) |
4-6 |
4-6 |
4-6 |
Water chiller (5HP) |
|
Temperature regulation range(°C) |
6--13 |
6--13 |
6--13 |
||||
Oven water | Pressure(bar) |
4-6 |
4-6 |
4-6 |
Water chiller (5HP) |
||
Temperature regulation range(°C) |
6-13 |
6-13 |
6-13 |
||||
Machine specification | Machine dimension(m)(L*W*H) |
3.3X1X2.3 |
4.3X1X2.3 |
4.8X1X2.3 |
|||
Machine weight(Kg) |
3200 |
3800 |
4500 |
Air Compressor | WH-2.0/30 | 3sets |
Air Dryer | 6.0m3/min 30Kg | 1set |
3 Stage Air Filter | 6.0m3/min 30Kg | 3sets |
Oil separator | sorted | 1set |
Air Tank | 2 m3 | 1set |
Mold Chiller | 6HP | 1set |
Oven Chiller | 3HP | 1set |
1L Blowing Mold | 1000ml | 1set |
Q: Your company is a transactional company or an industrial manufacture factory?
A: We are an industrial manufacture factory which locates in Zhangjiagang city.1>The machine will be tested and checked at our workshop before delivery.
2>After one year, we will supply accessories are provided only one the cost price.
3>Free Spare Parts : Digital instrument, Sealing, Stretching cylinder seal ring, Mould-adjustment wrench, Furnace temperature table, Furnace heating tube and other relative vulnerable part.
4>Free production technology and process configuration.
5> We can help you to design the product line, workshop and provide turn-key project.
6>Installation: Experts' team to buyer's country after confirmation that the goods arrived in site and civil works completed get ready for installation. Funds for trip need to be payed by client and extra salary $100/day during the engineer's journey.
7>Warranty: One year from the date of Installation or acceptance of the Plant whichever comes first